Friday, November 21, 2014
Monday, November 17, 2014
Total renovation of the office space: The chill water system being added plus the wall partitioning; Part 07
These are more pictures of the renovation on the office space. The chill water system being added plus the wall partitioning.
To be continued.
Total renovation of the office space: Last meeting in the Boardroom and the end of my room as I know it; Part 04
To be continued.
Total renovation of the office space: Contractor interview; Part 01
Total renovation of the office space: Opening the completed tender documents from prospective contractors; Part 02
Total renovation of the office space: Last Friday went office furniture shopping at a couple of well-known office furniture providers; Part 03
Total renovation of the office space: Last meeting in the Boardroom and the end of my room as I know it; Part 04
Total renovation of the office space: Complete demolition of lobby, pantry, toilet, boardroom and 3 HOD rooms; Part 05
Total renovation of the office space: Finalising the insurance and the chill water airconditioning system; Part 06
Monday, November 3, 2014
Total renovation of the office space: Finalising the insurance and the chill water airconditioning system; Part 06
Before we started the renovation, an insurance rider was taken to ensure and damage is covered by insurance.
Typical communication between the designer and the main contractor. This is the beauty of mobile phone with cameras.
A typical project meeting with all stakeholders - project manager, main contractor, aircond contractor etc.
A quote that we got to get temporary air-conditioning. Did get it in the end.
A picture tells a story that is difficult to misinterpret.
To be continued.
Total renovation of the office space: Last meeting in the Boardroom and the end of my room as I know it; Part 04
Typical communication between the designer and the main contractor. This is the beauty of mobile phone with cameras.
A typical project meeting with all stakeholders - project manager, main contractor, aircond contractor etc.
A quote that we got to get temporary air-conditioning. Did get it in the end.
A picture tells a story that is difficult to misinterpret.
To be continued.
Total renovation of the office space: Contractor interview; Part 01
Total renovation of the office space: Opening the completed tender documents from prospective contractors; Part 02
Total renovation of the office space: Last Friday went office furniture shopping at a couple of well-known office furniture providers; Part 03
Total renovation of the office space: Last meeting in the Boardroom and the end of my room as I know it; Part 04
Total renovation of the office space: Complete demolition of lobby, pantry, toilet, boardroom and 3 HOD rooms; Part 05
Tuesday, October 7, 2014
Total renovation of the office space: Last meeting in the Boardroom and the end of my room as I know it; Part 04
My room as I knew it, is no more. The table and the carpets have been ripped off.
...stripped bare...
Only the chairs are not touched (yet).
My cabinets are now in pieces. Being set away to be re-purposed and re-used some else.
The last meeting in the board room. Despite the meeting, the demolishing crew was still hard at work. They are taking down the glass panels.
Off with the first one.
...stripped bare...
Only the chairs are not touched (yet).
My cabinets are now in pieces. Being set away to be re-purposed and re-used some else.
The last meeting in the board room. Despite the meeting, the demolishing crew was still hard at work. They are taking down the glass panels.
Off with the first one.
Total renovation of the office space: Contractor interview; Part 01
Total renovation of the office space: Opening the completed tender documents from prospective contractors; Part 02
Total renovation of the office space: Last Friday went office furniture shopping at a couple of well-known office furniture providers; Part 03
Friday, October 3, 2014
Total renovation of the office space: Opening the completed tender documents from prospective contractors; Part 02
Receiving all the tenders that was submitted by prospective contractors plus the tender cheques. Opening each one in front of all members of the renovation committee for transparency.
Going through each one of the tender to compare and contrast.
From the five tenders we received we have shortlisted it to just 3 for the next stage of elimination.
Going through each one of the tender to compare and contrast.
From the five tenders we received we have shortlisted it to just 3 for the next stage of elimination.
Total renovation of the office space: Contractor interview; Part 01
Monday, June 9, 2014
Tuesday, June 18, 2013
New Shell Malaysia Corporate Headquaters, Brickfields, Kuala Lumpur
Took this picture on Sunday, 15 June 2013 of the new Shell Malaysia corporate headquaters on Jalan Brickfields, Kuala Lumpur. The glass facade is up and the workers are now putting the finishing touches to the building. Trees and carpet grass have been planted.