Search this Blog & the WWW

Pages

Friday, October 10, 2014

Total renovation of the office space: Complete demolition of lobby, pantry, toilet, boardroom and 3 HOD rooms; Part 05

The lobby is no more. Looks like a war zone.


All the old pipes and wires also got to go. Main work is done at night.


Very dusty.


The ceiling plasterboard in now on the floor.


By morning, the debris has been hauled away.


Didn't realised how spacious the floor was.


When completed, all the piping will be exposed as a form of ceiling art.





The main aircond blower has been removed.


This was the toilet.


This was the pantry.




Total renovation of the office space: Contractor interview; Part 01

Total renovation of the office space: Opening the completed tender documents from prospective contractors; Part 02

Total renovation of the office space: Last Friday went office furniture shopping at a couple of well-known office furniture providers; Part 03

Total renovation of the office space: Last meeting in the Boardroom and the end of my room as I know it; Part 04

 

 

No comments:

LinkWithin

Related Posts with Thumbnails